Owner’s Representative in Naples, FL

Goldstone Management, Inc. is an owner’s representative firm in Naples, FL, protecting capital, schedule, and design intent on luxury residential, mixed use, and commercial development. With over $710 million directed and a fee structure never tied to a contractor, architect, or broker, ownership gets representation with no conflict of interest, from the first feasibility study through final closeout.

Goldstone Management, Inc.

What I Do

I represent developers, family offices, and private owners from feasibility through closeout on luxury residential, condominium, mixed use, and commercial projects throughout Naples and Southwest Florida, with completed work in Sarasota, St Petersburg, Palm Beach, and Connecticut. I answer only to ownership. My fee is never tied to a contractor, an architect, or a broker, which is what lets me protect your interests without conflict. If you are building or renovating in Naples and Southwest Florida and want representation that has directed over $710 million in luxury development, let’s talk.

Where I Add Value

Consultant and Contractor Coordination

Accountable across GMP, cost-plus, and self-perform delivery

  • Design team, GC, and every consultant held accountable to contract
  • RFP and bid leveling on scope and qualifications, not lowest number
  • Accountability structured before contracts are signed
  • Scope gaps and duplicate billing caught before they reach a pay application

Budget and Construction Cost Control

$4.5M protected across a $500M portfolio

  • Disciplined buyout, value engineering, and change order review
  • $1.95M saved at 75% buyout on a $140M Naples development
  • Every dollar tracked by line item, reported to ownership on schedule
  • Savings redirected to ownership’s priorities, not absorbed into margin

Schedule and Field Constructability

Delivered 2 to 3 months ahead of schedule

  • Architectural, structural, civil, and MEP review before conflicts reach the field
  • Conflicts caught on paper, not in the field
  • Long lead items tracked against the CPM schedule
  • Projects delivered on or under budget

Local Market and Permitting Knowledge

Applied before a plan review rejection forces a costly redesign

  • HVHZ wind and flood compliance, FEMA finished floor elevations
  • Historic facade and waterfront permitting navigated
  • Regulatory realities applied before design is finalized
  • Relationships with local building officials keep permitting on schedule

Design Quality and Enduring Craftsmanship

3 Aurora Awards for design and construction excellence

  • Submittal review, mockup standards, and field quality control
  • Design intent held across architects, interior designers, and contractors
  • Best Mixed Use, Best Multifamily Housing, Best Interior Renovation
  • Commissioning verified, systems confirmed before ownership takes possession

Capital Protection and Risk Management

Risk surfaced before it reaches a pay application or lender draw

  • Procurement, sales, and leasing milestones structured for ownership
  • Insurance programs negotiated, including OCIP and builder’s risk
  • Financial exposure forecast on a rolling basis
  • Loan closing and stabilization reached without financial surprises

Who I Represent

Who I Work With

Every project starts with an owner who has something real at stake, capital committed, a reputation on the line, a building that has to work for decades after the ribbon cutting. I work directly for that owner, on luxury residential, condominium, mixed use, and commercial projects throughout Naples and Southwest Florida.

  • Private Owners
  • Family Offices
  • Real Estate Developers
  • Luxury Residential Buyers
  • Condominium Associations
  • Mixed Use Developers
  • Commercial Property Owners
  • Capital Partners and Lenders

Don’t see your project type here? Get in touch and let’s talk about it.

Get In Touch

What Falls Under Each Phase

Five phases, from feasibility through closeout, each with a defined scope and a number attached.

Feasibility and Budgeting

$710M+ directed across 10 signature projects

  • Site and program feasibility
  • Budget modeling before design is finalized
  • Architect and consultant selection
  • Entitlement and permitting risk review

GMP Negotiation and Buyout

$1.95M saved at 75% buyout on The Avenue

  • GMP contract review and negotiation
  • Trade buyout oversight, package by package
  • Value engineering without design compromise
  • Loan draw milestone structuring

Early Constructability Review

Delivered 2 to 3 months ahead of schedule

  • Architectural, structural, and MEP drawing review
  • Conflict resolution before it reaches the field
  • Long lead item tracking against the schedule
  • Submittal and mockup standards

Change Order and Cost Control

$4.5M protected across a $500M portfolio

  • Change order review against contract and drawings
  • Pay application scrutiny
  • Budget and contingency tracking
  • Milestone based reporting to ownership

Closeout and Owner Transition

Ground floor retail fully leased at turnover, Aster & Links

  • Punch list tracked to actual completion
  • Commissioning verification, not just installation
  • Warranty documentation
  • Closeout timed to capital events

How I Work With You

A clear process from first conversation through project closeout.

1

Initial Project Conversation

A straight, no pitch read on where your project stands and whether representation moves the needle.

2

Project and Scope Review

I figure out whether your project needs full feasibility through closeout support, or a single phase.

3

Engagement Terms Defined

Fee structure set so my compensation is never tied to a contractor, architect, or broker.

4

Active Project Onboarding

I get into your drawings, contracts, budget, and schedule immediately to find risk before it becomes a change order.

5

Active Field Oversight

GMP negotiation, constructability review, and change order scrutiny, the discipline behind $1.95M in savings on The Avenue.

6

Ongoing Owner Reporting

Milestone based reporting keeps you and your capital partners current on cost and schedule in real time.

7

Closeout and Transition

Punch lists tracked to completion, systems commissioned, and closeout timed to whatever capital event depends on it.

$710M+
Capital Directed
100%
Referral and Repeat Client Based
13+
Years in Development
10
Signature Projects
3
Aurora Awards
1.9M+ SF
Developed

Testimonials

What the People I Work With Say

Brandon Lacoff

Dan ran project management across our residential and commercial portfolio for several years, overseeing everything from ground up multifamily to a full office renovation we managed entirely in house. He held our GCs, PMs, and superintendents accountable to budget and schedule on projects representing hundreds of millions in value. I’d work with him again without hesitation.

Brandon Lacoff

Founder | Chairman | CEO of Belpointe

John Fareri

Dan ran my projects from start to finish and I never had to worry about them. He’s incredibly detail oriented and catches problems before they become expensive. He’s straight with me and I trust his judgment completely.

John Fareri

CEO of Fareri Associates

David Diamond

Daniel’s leadership and expertise have brought great value to the projects we have partnered on. He demonstrates an elite ability to lead a team of design professionals, general contractors, and jurisdictional authorities to accomplish the client’s project goals for schedule, budget, and quality. He’s responsive and makes wise decisions that keep the team accountable and the project moving forward.

David Diamond

Co-Founder | CEO | Co-Chairman of the Board, DeAngelis Diamond

Christine Lutz

Daniel is an absolute pleasure to work with. He’s responsive, knowledgeable, and always keeps the project moving in the right direction. He makes sure our sales team has the information we need to confidently guide buyers through the process, and he’s proactive in finding answers before questions become issues. Having Daniel as part of the team gives everyone a greater sense of confidence, and his professionalism and collaborative approach make him a tremendous asset to the project.

Christine Lutz

Director of New Development Sales, Dawn McKenna Group – Coldwell Banker

Matt Kragh

Daniel is one of the best owner’s reps I’ve worked with. We’ve collaborated on The Mark and The Avenue, and he understands architecture well enough to protect design intent through construction, not just chase budget and schedule. He keeps consultants coordinated, catches issues early, and makes decisions instead of sitting on them. Projects move faster and smoother when he’s involved.

Matt Kragh

Founder of MHK Architecture

Mitchell Siegel

Daniel got Cocoon open on time for the Palm Beach season, which was no small feat given the timeline and everything unique to building on the island. He kept the project moving, stayed on top of every detail, and made the whole process easy for me as the owner. I’d absolutely work with him again.

Mitchell Siegel

Founder of Cocoon Gallery

Read more testimonials

Frequently Asked Questions

What does an owner's representative do that a general contractor doesn't?

A general contractor is hired to build the project and is paid based on the cost of construction. An owner's representative works only for you, with no financial interest in the construction cost, and is responsible for protecting your budget, your schedule, and your interests through every phase, from preconstruction through closeout.

Why should I hire an owner's representative in Naples, FL?

Naples and Southwest Florida carry their own permitting timelines, HVHZ requirements, and a construction market where costs and consultant quality vary widely. I bring 13 plus years of experience specific to this market, direct across over $710 million dollars in luxury residential, mixed use, and commercial development, and have protected clients from over $4.5 million dollars in cost exposure across that portfolio.

How is an owner's representative different from a construction manager?

A construction manager typically works within the delivery structure of the project and can carry construction risk or fee tied to the build. As your owner's representative, I sit entirely on your side of the table, with no ties to the GC, the CM, or any consultant, so every recommendation is made in your interest alone.

What does a GMP contract review actually catch?

A proper GMP review checks the buyout against the design documents line by line, confirms allowances are realistic rather than placeholders, verifies contingency is structured to protect you rather than the GC, and flags scope gaps before they turn into change orders after the contract is signed. On one buyout alone, this process identified $1.95 million dollars in savings before the contract was signed.

What types of projects does Goldstone Management work on?

I work on high end residential, mixed use, and commercial development across Florida and Connecticut, from private estates and waterfront homes to multifamily and condominium projects. My portfolio includes award winning work such as Aster and Links and The Avenue.

When should I bring on an owner's representative, before or after hiring an architect?

Before. Bringing in representation before you hire an architect means budget, constructability, and permitting realities shape the design from day one, instead of forcing expensive redesigns later once the numbers come back over budget.

Is Goldstone Management a licensed contractor?

No, and that is by design. I am not a contractor and I do not hold a stake in construction cost. That independence is what allows me to hold the GC and consultants to their contracts without a conflict of interest.